IT Hardware BOM – C12 Onward

IT Hardware Bill of Materials — C12 Onward

Detected headers:
The page will locate the row whose headers include “Line Item” (starting at C12) and use that as the master. The dropdown is auto-built from Line Item and Unit Cost. Quantity is editable; Total auto-calculates. Export keeps the same headers and order as your C12 block.
Line ItemQuantityUnit CostTotal
Grand Total0.00
Note: The visual table shows columns needed for calculation. Any extra columns in your C12 headers (e.g., OPEX) will be exported as blank unless present in the master.